X

The integrated clean energy solution you seek is here! 

The typical installation process of solar systems usually takes 2 to 3 months to be completed depending on the complexity of the project. Sunseap takes your business schedule into consideration, ensuring your business operations go on smoothly with non-penetrating mounting methods that are able to withstand all types of weather conditions.

In addition, we work closely with clients to assist them to attain the Building and Construction Authority’s (BCA) Green Mark certification that recognises a business’s efforts in sustainability and create a competitive advantage . 

DCIM100MEDIADJI_0040.JPG

Jurong Port 

System Size: 9.5 MegaWatt-peak (MWp)
Location: Jurong
Notable Points: World’s largest port based solar installation

Read More
DCIM100MEDIA

Panasonic 

System Size: 2.4 MegaWatt-peak (MWp)
Location: Bedok
Notable Points: Largest solar system capacity in the manufacturing sector

Read More

singapore-american-school-solar-panels

Singapore American School

System Size: More than 1 MegaWatt-peak
Location: Woodlands
Notable Points: Largest solar system in an educational institute| Awarded Solar Pioneer Award from EDB in 2013 | Green Mark Gold Plus

Read More

Singapore Component Repair

United Technologies Corporation

System Size: More than 5 MegaWatt-peak (MWp)
Location: Loyang, Seletar and Tuas
Notable Points: Largest solar system capacity in the aerospace sector | Awarded Solar Pioneer Award from EDB in 2014

Read More

DCIM100MEDIA

ABB

System Size: 320 kilowatt-peak (kWp)
Location: Tuas
Notable Points: Pioneer project utilising a central inverter system in Singapore

Read More

IMG_1273

Jurong Health Services Pte Ltd

System Size: 120 kilowatt-peak (kWp)
Location: Ng Teng Fong Hospital
Notable Points: First to embark on solar energy inititatives in the local health care sector

Read More